I require a parcel-level cash plan before you sign. Evaluate acquisition basis, exit path and working-capital exposure so offers match liquidity.
By Olufemi Ajose ·

Pain point: Your enthusiasm for a deal is moving faster than your understanding of cash exposure. Intent: Evaluate acquisition basis, exit path, and working-capital exposure before commitment.
Criteria: - Every line item must have an estimated dollar amount and an expected payment date. - If an item is unknown, categorize it, estimate a conservative upper bound, and flag it as contingent until documented. - Convert headline claims into required parcel counts and transaction cadence to reach the implied scale. Record the acquisition basis and the working-capital required per parcel and aggregated for the planned cadence.
Checklist: - Completed per-parcel P and L with conservative estimates - Aggregated working-capital requirement for planned transaction cadence - Acquisition basis defined per parcel and per batch
Criteria: - Each calendar entry must list a committed funding source: operating account, bridge facility, committed investor funds, or contingency reserve. - No calendar entry can be marked as covered by an unsecured verbal promise. - Funding must be documented in writing before the contract is signed.
Checklist: - Cashflow calendar showing dates and amounts for each outflow - Committed funding source attached to each line - Contingency reserve size calculated and available
Criteria: - Downside scenario must be credible and funded within the reserve without relying on uncommitted capital. - Specify the trigger points at which you will pause, renegotiate, or seek additional funding. Triggers must be objective and measurable, for example: reserve depletion to 50 percent, title defect unresolved at 120 days, or buyer demand below target for 90 consecutive days. - Verbal capital commitments do not count toward funding the Downside scenario.
Checklist: - Best, Base, Downside scenarios with cash required at 90, 180, 360 days - Defined reserve threshold and explicit stop conditions - Written commitments for any capital labeled as committed
Criteria: - Do not issue final earnest deposits until the per-parcel P and L and cashflow calendar are complete and funding is documented. - Include contingencies tied to title clearances and documented funding. If funding or title items remain unresolved, use offer language that limits your cash outlay. - Maintain an auditable checklist at offer time: parcel P and L complete, cashflow calendar built, funding sources committed in writing, downside acceptable against reserves.
Execute these steps with discipline. Your reputation and capital hinge on predictable cash control. Lock the cash plan before you lock the signature.